EV Charging Consultancy for Sites and Fleets

Plan the right chargers, and the power to run them, before you build.

Request a Consultation Read the Consultancy Policy
Consultancy

EV Charging

A charging station is more than a unit on a wall. It has to fit the electrical capacity of the site, suit the vehicles and traffic it will serve, and be manageable once it is running. The consultancy works through these points and gives you a staged plan and a cost reference.

What It Covers

What the consultancy covers

Site load and capacity

Charger demand checked against the existing electrical capacity of the building or site.

AC or DC charging

Level 2 AC and DC fast chargers matched to your traffic, dwell time and vehicle mix.

Network and payment

An OCPP network layer for access control, payment and remote diagnostics across chargers and locations.

Standards review

IEC 61851, NFPA 70 and SASO requirements identified before design starts.

Rollout and upkeep

Phased installation, testing and a maintenance plan that keeps chargers online.

The exact scope depends on your site and is agreed in writing before work starts.

What You Receive

A plan you can act on

01

Site and requirements review

We review your site conditions, drawings and documents, and what you need the facility to do.

02

Findings and options

A written summary of what we found, the realistic options, and where money can be saved or risk reduced.

03

Start-to-finish project plan

The stages of the project in order, from design and procurement to installation, testing and handover.

04

Reference costing

An indicative cost reference for planning and budgeting, prepared from the information available at the time.

05

How the work was done

A plain explanation of the method, assumptions and standards behind the advice, so your team or another contractor can follow it.

Fees

How pricing works

Consultancy is a paid service and is not free. The fee depends on your site, your sector, the size of the facility and the stage of the project, so there is no single price list.

Send a request and we will reply with a written quotation in Saudi riyals stating the scope, the deliverables and the fee. Nothing starts until you accept it in writing.

Common Questions

Frequently Asked Questions

Can the consultancy plan a rollout across several sites?

Yes. A network layer can manage several chargers and locations together, and the plan can phase the rollout site by site.

Is the consultancy free?

No. Consultancy is a paid service. We quote a fee in writing after we receive your request, and work starts only after you accept it.

Is the reference costing a binding quotation?

No. It is an indicative reference for planning and budgeting. A binding price arises only from a signed contract or purchase order.

Do I have to buy equipment or installation from Black Arrow?

No. The consultancy is a separate service. You may use the plan with any contractor.

📞Call Now 💬WhatsApp